An unstable bank of the Snoqualmie River resulted in a damaged water main and a risk to the neighborhood streets. The City of Snoqualmie, in collaboration with Parametrix, Inc and KLB Construction to install a revetment along the bank including pilings, large rocks, and a geogrid to reinforce and protect the bank.
Watch Video